Ana Sayfa
Home Page
  About Us Completed Projects Current Projects Contact Us

COMPLETED PROJECTS


EMPLOYER
NAME OF PROJECTS
Contract Date
Completion Date
Value ($)
ILLER BANK 6 AREA MANAGEMENT
Karaören Water System Construction
14.06.1972
11.10.1973
510.860,00
SIMEL WATER CONST LTD STI
Kızılören Water Line Construction
24.04.1973
31.12.1973
597.737,00
ILLER BANK 2 AREA MANAGEMENT
Mustafakemalpaşa Water System Construction
15.02.1976
10.12.1976
844.173,00
ILLER BANK 2 AREA MANAGEMENT
Karacabey K.S.S.Waster Water System Construction
07.10.1976
10.06.1977
412.352,00
ILLER BANK GENERAL DIRECTORATE
Sungurlu Water System Construction
28.08.1973
24.02.1978
1.745.153,00
ILLER BANK GENERAL DIRECTORATE
Manisa Water System Construction
05.12.1973
08.05.1981
7.238.933,00
ILLER BANK GENERAL DIRECTORATE
Selçuk (izmir) Waster Water System
30.12.1980
06.11.1985
8.662.870,00
ILLER BANK GENERAL DIRECTORATE
Kuşadası (Aydın) Waterline Construction
06.04.1983
24.01.1985
1.039.839,00
ILLER BANK GENERAL DIRECTORATE
Manisa Waste Water Constr. K.K.S.Road Construction
27.01.1976
05.05.1986
49.744.276,00
ILLER BANK GENERAL DIRECTORATE
İzmir III.Part Main Interceptor Construction
26.07.1983
25.11.1998
79.319.685,00
ILLER BANK GENERAL DIRECTORATE
Yalova-Gölcük Coast Line Potable Water Line
30.01.1984
02.11.1990
41.329.523,00
ILLER BANK GENERAL DIRECTORATE
Denizli Waste Water System
08.08.1985
13.06.1991
14.573.214,00
IZSU GENERAL DIRECTORATE
Bornova N 2500 Industrial Area Interceptor (izmir)
18.06.1993
24.01.1996
6.153.409,00
ILLER BANK GEN.DIR. 3 AREA MANAGER
Manisa WW Construction
17.07.1995
15.12.1996
1.460.142,00
ASKI GENERAL DIRECTORATE
Contract 3 B Sewerage Collector Construction (Ankara) % 60
29.09.1995
19.10.1998
53.134.469,00
IZSU GENERAL DIRECTORATE
İzmir Sewerage Project 4A Part Interceptor
10.07.1997
21.07.1997
6.811.881,00
IZSU GENERAL DIRECTORATE
Bostanlı River Box Culvert Const.(izmir)
03.09.1998
16.11.1998
540.846,00
ADAPAZARI MUNICIPALITY
Adapazarı WWTP Ø 2400 mm Main Interceptor Line
04.05.1998
08.07.1999
15.891.501,00
ILLER BANK GEN. DIRECTORATE
Adapazarı 1.Part Water Lıne
06.10.1999
07.03.2002
17.529.719,00
IZSU GENERAL DIRECTORATE
Alsancak WW Collector Construction (izmir)
06.12.2000
28.02.2002
8.904.287,00
IZSU GENERAL DIRECTORATE
Ø 2200 mm.Steel Pipe Pressure Water Line (izmir)
11.04.2001
29.05.2002
1.366.060,00
IZSU GENERAL DIRECTORATE
Yeşildere Landslide Region and Kemeraltı Surface Stormwater Drainage Lines
23.09.2002
03.01.2002
476.674,00
IZSU GENERAL DIRECTORATE
Karsiyaka and Cigli Provinces Several Sewage Line Construction
21.02.2003
31.12.2003
3.175.571,00
MANISA CHAMBER OF INDUSTRY AND TRADE
Infrastructural Rehabilitation Works at Ist and 2nd Stage
17.04.2003
30.12.2003
1.125.226,00
Electricity Generation Co Inc. General Directorate units parking areas rail foundations revision
Construction of Seyitömer TS1.2 and 3rd
02.10.2002
21.01.2004
3.509.447,00
(CAL-BIR) CESME ALACATI Envrionmental Protection and Infrastructural Facilities Construction and Operations Union
TM4 Pumping Station and Sewage Network Construction
12.08.2004
31.05.2005
2.994.936,00
IZSU GENERAL DIRECTORATE
Buca Province Murathan District Sewage Network Construction
15.09.2004
20.05.2005
381.760,00
KAVAKLIDERE(MANİSA) MUNICIPALITY
Kavaklıdere (Manisa) Sewerage System Construction
14.11.2005
31.10.2006
476.244,00
İSKİ GENERAL DIRECTORATE
Paşaköy Treatment Plant Area-Waste Water network and Collection Construction
20.12.2005
23.12.2007
8.284.972,00
ILLER BANK GENERAL DIRECTORATE
Karasu (Sakarya) Sewerage System Construction
24.07.2002
28.01.2009
54.750.862,00
GENERAL DIRECTORATE OF BANK OF PROVINCES
Adapazarı (Center) Sewerage System Construction
02.02.1989
22.01.2009
141.977.875,00
MANİSA CHAMBER OF COMMERCE AND INDUSTRY ESTATE
Infrastructural Construction Works at Stage IV. And V
14.11.2006
12.03.2009
32.291.074,00
ANTALYA METROPOLITAN MUNICIPALITY (ASAT GENERAL DIRECTORATE)
Sewerage and Drinking Water Networks ard Construction Works of House Connection in Varsak
10.01.2008
29.06.2010
17.197.170,00
GENERAL DIRECTORATE OF BANK OF PROVINCES
Çınarcık-Teşvikiye-Kocadere (Yalova) Sewerage System, Joint Waste Water Treatment Plantand Sea Outfall Construction Work
09.07.2007
22.04.2011
14.148.953,00
ANTALYA METROPOLITAN MUNICIPALITY (ASAT GENERAL DIRECTORATE)
Construction of TM4, TM7, TM11,TM13 Waste Water Pumping Stations Sewage Network with House Conncetions
20.07.2009
27.06.2011
8.868.147,00


TOTAL :
607.469.840,00




Completed Projects
Present Commitment
   
Untitled Document
Copyright © 2012 ecegrup.com.tr .Tüm Hakları Saklıdır.