Ana Sayfa
Home Page
  About Us Completed Projects Current Projects Contact Us

COMPLETED PROJECTS


EMPLOYER
NAME OF PROJECTS
DATE OF CON.
DATE OF CON.
VALUE (US $)
6 Area Management Karaören Water System Construction 14.06.1972 11.10.1973
420.000
General Directorate Manisa Water System Construction 05.12.1973 08.05.1981
6.087.000
General Directorate Sungurlu Water System Construction 28.08.1973 31.12.1973
1.310.000
Simel Kızılören Water System Construction İnşaatı 24.04.1973 31.12.1973
568.000
General Directorate Manisa Waste Water System Construction & KKS Road Construction 27.01.1976 05.05.1986
44.697.000
2 Area Management Mustafakemalpaşa Water System Construction 15.02.1976 10.12.1976
672.000
2 Area Management Karacabey KSS Waste Water System Construction 07.10.1976 10.06.1977
328.000
General Directorate Selçuk Waste Water System Construction 30.12.1980 06.11.1985
6.702.000
General Directorate Kuşadası Water System Construction 06.04.1983 24.01.1985
845.000
General Directorate İzmir Merkez 3.Part main Interceptor Construction 26.07.1983 25.11.1998
64.457.000
General Directorate Yalova Gölcük Group Water System Construction 30.01.1984 02.11.1990
47.309.000
General Directorate Denizli Waste Water System Construction 08.08.1985 13.06.1991
17.355.000
İZSU General Directorate Bornava N 2500lük sanayi Kollektörü 18.06.1993 24.01.1996
4.950.000
General Directorate 3. Area Manager Manisa Waste Water System Construction 17.07.1995 15.12.1996
1.119.000
ASKI General Directorate Contract 3b sewerage collector construction (ankara) % 60 29.09.1995 19.10.1998
40.716.000
İZSU General Directorate İzmir Sewerage project 4a part interceptor 10.07.1997 21.07.1997
5.447.000
Adapazarı Municipality Adapazarı WWTP Ø 2400 mm main intercepter line 04.05.1998 08.07.1999
14.994.000
İZSU General Directorate Bostanlı Deresi River box culvert const.(izmir) 03.09.1998 16.11.1998
429.000
General Directorate Adapazarı I. part Water System Construction 06.10.1999 07.03.2002
14.297.000
İZSU General Directorate İzmir (alsancak) QQ collector construction 06.12.2000 28.02.2002
5.542.000
İZSU General Directorate Ø 2200 mm Steel Pipe Pressure Water line (izmir) 11.04.2001 29.05.2002
1.128.000
İZSU General Directorate Yeşildere landslide region and kemeraltı surface stormwater drainage lines 23.09.2002 03.01.2002
387.000
İZSU General Directorate Karsiyaka and cigli provinces several sewage line construction 21.02.2003 31.12.2003
2.540.000
MANISA Chamber of Industry and trade Infrastructurak rehabilitation works at 1 st and 2 nd stage 17.04.2003 30.12.2003
900.000
(CAL-BIR) CESME ALACATI Envrionmental Protection and Infrastructural FAcilities Construction and Operations Union TM4 pumping station and sewage network construction 12.08.204 31.05.2005
2.540.000
İZSU General Directorate Buca İlçesi Murathan Mahallesi Waste Water System Construction 15.09.2004 20.05.2005
314.000

Kavaklıdere (Manisa) Municipality

Kavaklıdere (Manisa) Sewerage System Construction 14.11.2005 31.10.2006
406.000





Completed Projects
Present Commitment
   
Untitled Document
Copyright © 2012 ecegrup.com.tr .Tüm Hakları Saklıdır.